Upholstery Shop Management Software

Upholstery shop software for workrooms where every piece is different and every yard counts.

Every piece that enters a workroom is its own job: its fabric, its foam, its trim, its size. We turn that into software that holds the full specification per piece, works out yardage with the pattern repeat counted, ties fabric rolls to jobs, and invoices in stages as pieces are delivered.

See our work

Bring one stuck workflow. Leave with a build, buy, repair, or wait recommendation.

Trusted by

Perceptional logoMusgrave GroupUrShipper logoBrux Dental SolutionsBella Skin Institute LogoEnergia RewardsDraftly logoTuneClub LogoSekou LMS logoLogo of food order management app gulaSnelwegDealsGrubly logoPSi logoInstantor Rewards logologo of Mobile app for events, membership clubs, and communitiesAldiFest retail campaign logoVidmattic logoEMS Connect logoWorx Squad logologo of Online Web App For Making Intrologo of Referral and Viral Marketing PlatformConcurrences logoGE logoTicketstop logo

The brief

Start with what is not working.

Good software decisions begin with the constraint, not a list of features or a preferred technology.

01

Detailed orders, materials, vendor purchasing, and production status live apart, so nobody can say what a piece needs or where it stands.

02

What the customer supplied, what must be ordered, and what it actually cost sit in separate spreadsheets, so the truth about a job is assembled by hand.

03

Fabric is ordered from habit, so a pattern repeat eats the allowance and the roll runs short with the piece half covered.

Plain answer

RaftLabs builds upholstery shop management software for upholstery and reupholstery workrooms. One record per piece holds its full specification, including fabric the customer supplies and leather the customer supplies, foam, trim, and dimensions, a yardage calculation that counts the pattern repeat, fabric rolls tied to the jobs drawing from them, and staged delivery with progress invoicing, so what was supplied, what was ordered, and what a job cost are read from the same record.

What to remember

  • Use this when the order book, the fabric store, vendor purchasing, and the workroom bench disagree about a piece.
  • Hold the whole specification on one record per piece: fabric, foam, trim, and dimensions, including material the customer supplies.
  • Work out yardage from the piece and its pattern repeat, not from a habit number carried from the last job.
  • Quote the workroom's own screens as their own scope: the specification record, yardage, roll store, and staged invoicing are a second product, not a single admin-panel line.
  • Hire freelancers for one small, well-defined task; use one accountable agency party when the work needs coordination across screens, rules, data, and connections.

The first decision is not what to build.

It is whether software is the right answer at all. We use four possible recommendations before discussing a development scope.

  • 01

    Buy

    Choose a maintained product when it handles your per-piece specification, your yardage, and your staged invoicing the way your workroom runs them, and the remaining gaps can be solved with configuration, a connector, or a small process change. Paying for software you do not have to maintain is often the better trade.

    Run the build-vs-buy numbers

  • 02

    Repair

    Keep the existing system when the order desk and the bench still get value from it and the code can be understood safely. Start with evidence: where the code lives, how the data is organized, what is tested, which outside services it depends on, who can access what, and how updates go live.

  • 03

    Build

    Own the system when your specification detail, yardage rules, or staged invoicing shape margin, customer trust, or speed, and no maintained product will hold them. Start with one complete path, usually the run from specification to final delivery, and the system connections that path cannot work without.

  • 04

    Wait

    Do not turn unsettled workroom rules into permanent software. Settle how pieces are specified, how yardage is worked out, and how staged invoicing should run, name the workflow owner, and measure the cost of the current spreadsheets before paying for a product.

Not sure which path is yours? Bring it to a 30-minute call. Leave with the answer in writing.

Fit

Custom workroom software should earn its maintenance burden.

A feature request is not enough. The case is real when the same constraint shows up in time, errors, margin, or customer trust.

A fit

Orders, materials, purchasing, and production status are tracked in separate places, and the errors reach customers as wrong fabric, late pieces, or surprise bills.

Your specification detail or yardage rules differ from a generic product, and the workroom keeps forcing workarounds.

The business can name a workflow owner and what 'done' looks like for the first release.

Not a fit

A maintained product fits your piece types and invoicing stages with reasonable configuration.

The team wants software to settle specification and yardage rules nobody has agreed yet.

The brief is a feature list with no user, transaction, or business result attached.

Not sure which side you are on? Use the first call to make that decision. A useful answer may be to buy, connect, repair, or wait.

Start with the operation, not the software.

A workroom problem usually starts as a paper problem. The order detail sits in one book, fabric and vendor orders in a spreadsheet, the bench list on a board, and the invoices somewhere else again. Each record looks fine on its own. The trouble starts when they disagree, and they disagree at the worst moment: a customer asking why their supplied fabric was not enough, when the yardage was never worked out with the pattern repeat counted.

The work itself makes a plain system fail. No two pieces are the same job. A system built for identical products cannot hold a specification where the fabric, foam, trim, and size all change piece by piece, and it cannot tell the difference between fabric the customer supplied and fabric the workroom must order. That difference is where workrooms lose money quietly, ordering what they already hold or starting a piece whose material has not arrived.

A second product hides inside the first. Customers see their specification, their stage invoices, and their delivery notes; your team lives in another set of screens: the specification record, the yardage calculation, the roll store, vendor orders, and the bench list. Quotes that squeeze all of that into an 'admin panel' line item are where budgets most often break, so we quote your team's screens as their own job, with their own users, from the start.

Custom software makes sense when one owned record per piece can hold specification, yardage, rolls, purchasing, bench status, and staged billing together better than a product, connector, or process change. The first release should take the smallest useful path from a piece being specified to its owner taking it home. It should not replace every tool at once.

We start where it hurts.

The order is only one part of the job. The real scope includes how pieces are specified, how yardage is worked out, how rolls and vendor orders are tracked, what happens when things fail, who can see and change what, and who runs it after release.

Specifications lost in a notes line

Give every piece its own fields for fabric, customer-supplied material, foam, trim, and dimensions. A change is made once on the record, and the bench, the order list, and the invoice all read the new version.

Yardage guessed from the last job

Work out yardage from the piece and its fabric, with the pattern repeat counted and a cutting allowance added. The order quantity is a calculation the workroom can check, not a habit.

Rolls promised twice

Tie each roll to the jobs drawing from it, yard by yard. The balance left is visible, and fabric already spoken for cannot be cut for another job by mistake.

Supplied and ordered materials mixed up

Mark every material as customer-supplied or to order, and record supplied fabric as received. The vendor list then holds only what the workroom truly has to buy.

Whole jobs invoiced only at the end

Deliver and invoice finished pieces in stages while the rest stay open. Cash arrives as work completes, and the final bill is a balance, not a shock.

Which one is yours?

Bring it to a 30-minute call. Leave with a build, buy, repair, or wait recommendation in writing. Free, whether or not we ever work together.

Verticals

Custom software for specialised operations.

Some workflows only exist in one kind of business. The same rules apply: configure first, build only the part the maintained products cannot cover, and start with one complete path.

Reupholstery workrooms

The core work: furniture stripped, rebuilt, and recovered piece by piece. Each piece carries its specification, its yardage, and its bench state, so a returning customer and a returning chair both start from their record.

Custom cushion and soft furnishing makers

Cushions, bolsters, and loose covers live on dimensions and foam choice. The specification holds both, and yardage follows the set, so a matching set is cut from one calculation and one roll where the pattern demands it.

Workrooms serving interior designers

Designer jobs arrive as sets across rooms, with fabric supplied by the designer and deadlines tied to an install date. Pieces group under the project, supplied material is tracked per piece, and staged delivery follows the install order.

Furniture retailers with a workroom

A sold piece and a recovered piece share fabric stock and bench time. The sale record and the workroom job stay linked, so the shop sees the whole life of a piece it sold and now maintains.

Multi-bench and multi-site workrooms

When several benches share the work, each bench list shows its pieces, their specifications, and what each is waiting on. The manager sees the whole board without stopping anyone to ask.

Check it yourself

No story here. A check you can run instead.

This page carries no client story for upholstery workrooms, because we will not invent one. What you can do is test any system, ours included, against one full piece before you sign.

Run one piece from specification to delivery: record its fabric, foam, trim, and dimensions, check the yardage with the pattern repeat counted, draw the fabric from a roll and watch the balance fall, then deliver one piece of a set and invoice only that piece. Specification, yardage, stock and billing should be one record, not four places that agree only when someone retypes them.

The one-piece test

What to check before you sign

Bring this check to any vendor, including us. A system that cannot pass it in a demonstration will not pass it in your busiest week.

Which specification, yardage, or invoicing problem is costing you the most right now?

Bring it to a 30-minute call. Leave with a build, buy, repair, or wait recommendation in writing. Free, whether or not we ever work together.

How it works

Close one expensive risk before opening the next.

Each stage answers a buyer question and leaves behind a decision you can inspect. The next stage only opens when the expensive uncertainty in the current one is small enough to accept.

  1. 01
    Understand

    Trace the real workflow

    Where is the cost or failure actually coming from?

    Follow one piece from start to finish: the order and specification, the yardage and vendor orders, the bench work, and the staged delivery and final invoice. Include the workarounds, the phone calls, the duplicate records, and the corrections that a tidy process diagram usually misses.

    Decision produced

    A map of the workflow, exceptions, owners, systems, and the baseline cost or delay worth changing.

    Risk closed

    Paying to automate the visible symptom while the expensive constraint remains.
  2. 02
    Shape

    Choose the first useful release

    What needs to exist together for one useful result to work?

    Choose the shape from the way the work happens, not from a preferred technology. Name the kinds of piece you take in, how specifications and yardage work, the invoicing stages, who can access what, the exceptions, and the result the first release must complete.

    Decision produced

    The right mix of web, mobile, desktop, browser extension, connected device, or behind-the-scenes connection work, with the first-release boundary and a clear definition of done.

    Risk closed

    A small-looking feature list that quietly depends on several interfaces, systems, and owners.
  3. 03
    Prove

    Review working software

    Will it hold up outside a controlled demo?

    Review the product against the agreed workflow, not a tour of finished screens. Run a full set at a busy week's pace, change a fabric mid-job and watch every screen follow, and test what happens when a roll runs short with a piece half covered.

    Decision produced

    Working checkpoints tested with realistic data, real user types, system connections, recovery plans, and the people who will use or run the system.

    Risk closed

    Discovering the important gaps during migration or after customers depend on the release.
  4. 04
    Transfer

    Release, measure, and hand over

    Did the new workflow improve the original constraint, and can another capable team operate it?

    Move a controlled set of users or records first. Compare yardage overruns, pieces blocked on material, jobs invoiced late, or another agreed measure with the starting point before adding the next workflow.

    Decision produced

    A controlled release, comparison with the baseline, operating notes, account ownership map, and a recommendation for what should happen next.

    Risk closed

    Measuring development activity instead of the business result, or depending on the original vendor to keep the system running.

What stays out of the black box

These are operating conditions to put in the engagement, not claims to take on faith.

The scope names one complete workflow

The user, the trigger, the decisions, the data, the exceptions, and what 'done' looks like. A screen list is not enough.

Progress is visible in working software

Reviews against the product at agreed checkpoints, while there is still time to act.

A scope change has a price before it has code

A new workflow or system connection shows its effect on cost and timing before anyone approves it.

Ownership exists throughout, not only at handover

Code, cloud, data, and provider access stay visible and under your control from day one.

The work is checkable without being technical

Checkpoints are working software you use yourself, reported in plain language.

Custom software by industry.

Start from your domain. Each area below is a working practice with shipped products behind it.

What it costs

Every project starts at $10K.

The first phase turns the costliest patched workflow into a scoped build with what 'done' looks like agreed in writing.

Starting investment

Starts at $10K

Workflow complexity, systems to connect, data migration, and user roles set the scope. After a 30-minute call, you get a written build, buy, repair, or wait recommendation plus first-phase direction. Free, whether or not you build with us.

Build or buy

Buy an existing productBuild custom software
Best fitHandles your per-piece specification, yardage, and staged invoicing with reasonable setup, and its pricing makes senseThe way your workroom specifies and costs each unique piece is itself the advantage
Manual workConfiguration and process changes can remove the constraintRepeated manual work rebuilding specifications and yardage after every order has a measurable cost
ConnectionsExisting connections work with reasonable setupA critical connection to your payment, accounting, or messaging service cannot be done cleanly any other way
Workroom modelThe product already handles your customer-supplied materials, pattern repeat yardage, and staged delivery the way your workroom doesOwn custom software only when your specification detail, yardage rules, or invoicing stages justify build and support

Work with us

Bring one stuck workflow. Leave with a decision.

In a 30-minute call, we will help you decide whether to buy, connect, repair, build, or wait. If custom software is not the sensible next move, that is still a useful answer.

  • One named workflow owner and one complete path for the first phase.
  • Scope, price, what 'done' looks like, and exclusions agreed before paid work starts.
  • Code, cloud, data, and provider access remain under your control.

Frequently asked questions

Straight answers to what buyers ask before they scope. Still stuck? .

It is software that runs a piece from order to delivery. Each chair, sofa, or cushion set is recorded once with its full specification: the fabric, the foam, the trim, and the dimensions that make this piece different from the next. That record becomes the yardage calculation, the vendor orders, the bench's work list, and the staged invoices. Because every step reads from the same record, what the customer supplied, what must be ordered, and what the job cost are never three separate answers again.

A piece is specified in its own fields, not in one notes paragraph. The record holds the fabric, including fabric the customer supplies and leather the customer supplies, each explained on the order as material the customer brings and the workroom fits; the foam type and thickness; the trim, such as piping, buttons, or nailheads; and the finished dimensions. When the customer changes the fabric mid-job, the change is made on that record, so the bench, the order list, and the invoice all read the new choice, not the old one.

Yardage starts from the piece: its size, how many cushions it has, and how the fabric will be cut. A plain fabric needs less than a patterned one, because a pattern repeat, the distance before the design starts again, forces extra length so the pattern lines up across seams and cushions. The calculation counts that repeat and adds the cutting allowance, so the order quantity comes from the piece and its fabric together. When the roll arrives, the amount is checked against the calculation, not against a habit.

Each roll in the store is its own record: which fabric it is, how many yards it holds, and what it cost. When a job draws fabric, the yards are taken from that roll on the job record, so the roll balance falls by what the piece actually used and the leftover is visible for the next job. A roll promised to a designer job cannot quietly be cut for a walk-in repair, because the record already shows whose yards they are.

The specification marks each material one of two ways: supplied by the customer, or to be ordered by the workroom. Customer-supplied fabric and leather are recorded as received, with the amount handed over, so nobody orders what is already in the store and nobody promises a start date before it arrives. Everything marked to order rolls into one vendor order list per job, with what has arrived and what is still missing shown against the piece waiting for it.

A job is often a set: eight dining chairs and a sofa rarely finish on the same day. When some pieces are done, they are marked delivered on the job and invoiced for that stage, while the pieces still on the bench stay open. The customer pays for what they have received, the workroom is not carrying the whole job until the last cushion, and the final invoice is only the balance, because the earlier stages are already on the record.

Each piece sits in a clear state: waiting on material, in production, in finishing, ready, or delivered. The bench works from that list in the order the workroom sets, and the person answering the phone reads the same state instead of walking to the bench to ask. A piece blocked on a fabric delivery shows as waiting on material, not mixed in with pieces that could start today.

Materials ordered, customer-supplied material recorded at no purchase cost, bench time, and any outside work, such as a frame repair sent out, are recorded on the job against its price. When the last piece is delivered, the job's cost is a reading from that record. Jobs that lost money show where: yardage under-ordered and re-bought at retail, bench time past the estimate, or a specification change that was never priced.

Buy an existing product when it handles your core workflow the way your business runs it, and its pricing makes sense. Build custom when the way you run that workflow is the way you compete and no maintained product will hold it, when repeated manual work after every job has a measurable cost, or when a critical connection, such as your payment or accounting service, cannot be done cleanly any other way. If your rules are still changing every month, wait and settle them first.

For a small, well-defined task with someone technical managing it, freelancers are often cheaper. The pattern that goes wrong is a non-technical buyer coordinating several freelancers becoming the project manager, the tester, and the person who discovers the pieces do not fit. An agency earns its fee when the work needs coordination across screens, rules, data, and connections: one accountable party, one phase price, and checkpoints against the whole workflow. If your need is one screen or one fix, hire the freelancer.

First phases start at $10K. A complete quote names every kind of user, including your own team: customers approving a specification and paying in stages, the person taking orders and ordering materials, the bench hands building each piece, and the owner reading job cost. It also names the system connections, such as your payment service, your accounting, and your messaging service, the records to be moved over, and what is excluded. The first paid phase may cover a bounded audit, a proof of concept, a recovery plan, or a small first release. The final price depends on how many kinds of piece you take in, how your yardage rules work, whether customer-supplied material is a large share of the work, what it needs to connect to, and whether past order records need moving over. The agreed phase is priced in writing before it starts, and any change is priced and approved in writing before the work is done.

Timing depends on scope: a bounded audit or proof of concept is a smaller engagement, while a system covering the full workflow takes longer. The schedule is set once the first workflow and what 'done' looks like are clear. The calendar holds more than building. It also holds settling your specification and yardage rules, moving past order records over, payment and messaging provider access and approvals, and training for order-taking and bench staff. A first release that lands in your busiest season gets its first real test in your hardest weeks, so starting early enough for quieter weeks to settle it first is part of the plan. Dates slip when records arrive late, approvals wait, or rules change mid-build.

Yes. Takeover is a common first engagement, and it always starts with an audit: where the code lives, how your data is organized, what is tested, which outside services it depends on, who can access what, and how updates go live. Code that is understandable and fit for the next release stays; only the parts blocking reliability get replaced. And if you already paid another vendor and have nothing working, the audit tells you which story you have before you spend more: the most expensive version is the product that looks finished, clean screens and clicking buttons, while underneath nothing is tested and the important checks run in the browser, where anyone can tamper with them, instead of on the server where they hold.

Security starts with the data, the people, who can see and change what, the systems it connects to, and where it runs. This kind of system holds customer contact details, payment records, specifications, and job photos, so the scope can include access controls, separate testing and live environments, protected passwords and keys, activity logs, backups, and recovery plans. We write down which protections are included and which evidence your team must provide. While we work: penetration testing is taken care of. No production data is used in development, ever: testing runs on made-up records. Backups are tested, and there are offboarding steps when someone leaves a team. The third-party services this design sends data to, such as payment services, cloud hosts, and any messaging services, are named in the scope document before you sign. We claim practices we can show you, not certifications.

Those duties stay yours. Rules on fabric and foam fire performance, labelling of reupholstered furniture, product safety, and local business record rules apply to your workroom and the pieces you hand back, and the obligation sits with the business doing the work. What the software can do is hold the records those duties need, such as which fabric and foam went into a piece, which fire label belongs to which job, and what the customer supplied, and produce them in the form your workroom already uses. Scoping names which records the system holds for those checks. We will explain plainly what the system records and what it does not, and we never describe a system as making your workroom compliant.

We need one person who owns the workflow, access to the relevant users and systems, timely answers on business rules, and someone who can accept or reject each milestone. A weekly working session is usually enough once the scope is stable. Your team should not have to manage developers day to day.

Ask for the quote to name everyone who will use the system, including your own team. Every platform has two products: what customers see, and what your people use all day: the specification record per piece, the yardage calculation, the fabric roll store, vendor orders, and staged invoicing, and a record of who did what. When that second product is quoted as an 'admin panel' on a single line, it becomes the overrun. Our quotes treat your team's screens as their own scope, with their own users. Then the phase names the workflow, what 'done' looks like, the price, and the exclusions, all before paid work starts.

You judge what you can see, not the code. Every checkpoint is working software you click through yourself, tested against the workflow agreed at the start: enter one piece with its fabric, foam, and trim and check the yardage against your own cutting judgement, draw the fabric from a roll and watch the roll balance fall, then deliver one piece of a set and invoice only that piece. Progress is reported in plain language: what changed, what's next, and what it costs. Because you own the code, the accounts, and the operating notes throughout, nothing about the work is locked inside our heads. Our job is to make the work checkable; your job is to check it against your business.

You own it, from day one. The code built for you, the cloud accounts, your customer, piece, and material records, analytics, and third-party subscriptions are in your name from the start, not handed over at the end. Outside services and open-source pieces keep their own licence terms. The operating notes and handover material stay current throughout, so another capable team can take over.

After the first release, work can continue as another fixed phase, as an ongoing product engagement, or with your own team running the system from the operating notes. Support arrangements are agreed in writing rather than assumed. Whoever maintains it, the standing costs keep running: hosting, payment service fees, messaging service charges, and any connected-service subscriptions the business uses. The code and accounts stay under your control either way.

You already hold everything. The code, the accounts in your name, your customer, piece, and material records, and the operating notes stay with you from day one, so there is nothing to extract from us and no unlock step. Another team can pick up from the notes as they stand.

We work on five principles. Switch to Async: updates are written so you can read them between jobs, not in a meeting you have to attend. Be Prepared: calls cover decisions that are ready to be made. Write: decisions and changes are written down where both sides can find them. Ask and tell: questions and bad news are raised in writing as soon as they appear. Own: the person working on a piece owns its outcome and says so plainly.

Yes. We sign your NDA before anything sensitive is shared, and the details you share for scoping, such as your rates, margins, and customer numbers, stay confidential. The stronger protection is ownership: the code, accounts, and data are yours from day one.

No. The team that scopes your system builds it, and the people on your calls are the people on your project. Our teams are in India & Ireland. Payment and messaging services named in the scope are systems the software connects to, not a handoff of your project.

RaftLabs builds with its own AI workflow process called RaftKit, which you can read about at raftkit.com. In plain terms, the work moves through five stages: a blueprint of what is being built and why, a written plan, the build itself, a two-stage review where work is checked before it can move on, and a final stage where what was learned is written down for the next piece of work. Problems found in review are graded, and the most serious grade stops the work from going out until it is fixed. For you that means the workflows are planned in writing, checked in stages, and tested against the way your business actually runs, rather than code appearing in one pass that nobody has reviewed.