Custom Framing Shop Software
Custom framing shop software for shops where the price lives in the details of each piece.
A customer brings in a piece, chooses a mat, a moulding, and glass, and trusts you with the original. We turn that run into software that holds the dimensions and materials on one workorder, shows a mockup of the finished piece before anything is cut, prices from current supplier lists, and follows the job through the bench queue to pickup.
Bring one stuck workflow. Leave with a build, buy, repair, or wait recommendation.
Trusted by
The brief
Start with what is not working.
Good software decisions begin with the constraint, not a list of features or a preferred technology.
Workorders are paper slips with dimensions and mat choices scribbled on them, so a misread number becomes a miscut frame.
Prices come from supplier lists that changed months ago, so the quote at the counter is not the cost at the bench.
Nobody can say which jobs are waiting on materials, which are on the bench, and which are finished and waiting for pickup.
Plain answer
RaftLabs builds custom framing shop software for framing shops that design, price, and make frames to order. One workorder follows each piece from intake through its dimensions, mat, moulding, and glass choices, a visual mockup the customer approves, pricing from current supplier lists, the production queue at the bench, and a ready status that triggers the pickup message, so a finished frame does not sit wrapped in the back uncalled.
What to remember
- Use this when the paper workorder, the supplier price list, and the bench queue disagree about what a job is and what it costs.
- Every workorder holds the dimensions, the mat, moulding, and glass choices, and a mockup of the finished piece the customer approved.
- Prices come from current supplier lists, so the quote at the counter matches the materials that get ordered.
- Quote the shop's own screens as their own scope: the design counter, the bench queue, materials ordering, and pickup lists are a second product, not a single admin-panel line.
- Hire freelancers for one small, well-defined task; use one accountable agency party when the work needs coordination across screens, rules, data, and connections.
The first decision is not what to build.
It is whether software is the right answer at all. We use four possible recommendations before discussing a development scope.
- 01
Buy
Choose a maintained product when it handles your workorders, your mockup, your supplier lists, and your bench queue, and the remaining gaps can be solved with configuration, a connector, or a small process change. Paying for software you do not have to maintain is often the better trade.
- 02
Repair
Keep the existing system when the counter and the bench still get value from it and the code can be understood safely. Start with evidence: where the code lives, how the data is organized, what is tested, which outside services it depends on, who can access what, and how updates go live.
- 03
Build
Own the system when your design, pricing, or queue rules shape margin, customer trust, or speed, and no maintained product will hold them. Start with one complete path, usually the run from intake to pickup, and the system connections that path cannot work without.
- 04
Wait
Do not turn unsettled pricing rules into permanent software. Settle how workorders, supplier lists, and the queue should work, name the workflow owner, and measure the cost of the current process before paying for a product.
Not sure which path is yours? Bring it to a 30-minute call. Leave with the answer in writing.
Fit
Custom framing software should earn its maintenance burden.
A feature request is not enough. The case is real when the same constraint shows up in time, errors, margin, or customer trust.
Intake, the design counter, the bench, and the till are tracked in separate places, and the errors reach customers at pickup.
Your mockup, pricing, or queue rules differ from a generic product, and the shop keeps forcing workarounds.
The organisation can name a workflow owner and what 'done' looks like for the first release.
A maintained product fits your workorder types and pricing rules with reasonable configuration.
The team wants software to settle pricing and queue rules nobody has agreed yet.
The brief is a feature list with no user, transaction, or business result attached.
Not sure which side you are on? Use the first call to make that decision. A useful answer may be to buy, connect, repair, or wait.
Start with the operation, not the software.
A framing shop problem usually starts as a paper problem. The workorder is a slip with dimensions in one hand and mat choices in another, the price comes from a supplier sheet, and the queue lives in the framer's head. Each record looks fine on its own. The trouble starts when they disagree, and they disagree at the worst moment: a customer at the counter looking at a finished frame that is not the size, the mat, or the price they remember agreeing to.
The bench itself makes a plain system fail. A framer has hands on a cutter or a joiner, not on a keyboard. Software that makes them stop, search, and retype workorder details for every small step will be abandoned for the paper slip within a week. The paper slip is what hides the finished frame in the back that nobody called about.
A second product hides inside the first. Customers see their mockup and their pickup message; your team lives in another set of screens: the design counter, the bench queue, materials ordering, pickup lists, and a record of who changed what. Quotes that squeeze all of that into an "admin panel" line item are where budgets most often break, so we quote your team's screens as their own job, with their own users, from the start.
Custom software makes sense when one owned workorder can hold intake, design, pricing, the bench queue, and pickup together better than a product, connector, or process change. The first release should take the smallest useful path from a piece being dropped off to its owner collecting it framed. It should not replace every tool at once.
We start where it hurts.
The workorder is only one part of the job. The real scope includes how pieces are taken in, how the design is approved before anything is cut, how prices stay current, what happens when things fail, who can see and change what, and who runs it after release.
Workorders on paper slips
Record each piece once at intake with its owner, its dimensions, its condition, and what it came in for. The design, the price, and the bench job all read from that one workorder, so a correction at the counter is a correction everywhere.
Customers surprised by the finished frame
Show the piece as it will look finished, with the mat, the moulding at its real width, and the glass, and record the customer's approval on the workorder. A design argument at pickup is settled by the picture they approved, not by memory.
Quotes priced from old supplier lists
Price every quote from the current supplier lists held in the system, and record which list each quote came from. When a moulding price changes, new quotes change with it instead of quietly losing margin.
Nobody knows where a job stands
Put every approved job on one queue that shows its stage and what is blocking it. The counter answers a customer from the screen instead of walking to the bench and interrupting the cut.
Finished frames nobody called about
Move every finished frame onto a ready list with the day it became ready, and send the pickup message from that status. A frame still waiting days later stands out instead of blending into the wrapped stack.
Which one is yours?
Bring it to a 30-minute call. Leave with a build, buy, repair, or wait recommendation in writing. Free, whether or not we ever work together.
Verticals
Custom software for specialised operations.
Some workflows only exist in one kind of shop. The same rules apply: configure first, build only the part the maintained products cannot cover, and start with one complete path.
Single-shop custom framers
The workorder run is the whole business: intake, design, pricing, the bench, and pickup, all day. The system keeps that run on one workorder per piece, so a new counter hand works the same way as the person before them.
Shops with a design counter and a bench team
Design and making are done by different people, so the approved mockup and the exact materials have to travel from the counter to the bench without being redrawn. The workorder carries them, and changes land on it once.
Framing departments in larger stores
A framing counter inside an art or gift store shares the till and the staff with the rest of the shop. The framing workorders stay separate and visible, while the sale at the till still reads from the same job.
High-volume and contract framing
Hotels, offices, and galleries order frames in batches. Batch jobs carry the same design across many pieces, with quantities and delivery stages on the order, so one approval covers the run and the queue shows the run's progress.
Shops that also sell ready-made frames
A frame sold from the wall and a frame made to order share materials and staff. Stock frames and custom workorders stay in one system, so the shop sees both sides of the counter in one place.
Check it yourself
No story here. A check you can run instead.
This page carries no client story for framing shops, because we will not invent one. What you can do is test any system, ours included, against one full framing job before you sign.
Run one job from intake to pickup: record the piece with its dimensions, build the design and approve the mockup, check the price comes from the current supplier list, follow the job through the bench queue, then mark it ready and check the pickup message went out. Intake, design, pricing, bench work and pickup should be one workorder, not four places that agree only when someone retypes them.
The one-job test
What to check before you sign
Bring this check to any vendor, including us. A system that cannot pass it in a demonstration will not pass it in your busiest week.
Which intake, pricing, or pickup problem is costing you the most right now?
Bring it to a 30-minute call. Leave with a build, buy, repair, or wait recommendation in writing. Free, whether or not we ever work together.
Let the work pick the shape.
The way people work should decide the form of the software. The design counter works face to face with a customer, the bench works standing with hands busy, and customers approve designs from their phones. Those facts tell us what belongs in the first release.
Web app
Work done across roles and locations. Counter staff, framers, the manager, and customers approving a mockup all get the same current workorder in a browser: no installs, no versions, no device limits. When in doubt, this is usually the right first surface.
Mobile app
Work away from a desk: photographing a piece at intake, or a framer updating a job at the bench.
Desktop app
Local hardware, large files, work without a browser. The counter station and the label printer for workorder tags often live here, where the shop must keep running on the local network.
Browser extension
One task inside a system that otherwise works.
Connected devices
Tag printers and bench-side devices, when the physical setting demands them and the equipment maker allows the connection.
One product may need several surfaces. Each one should support the same complete workflow, not start another feature list.
How it works
Close one expensive risk before opening the next.
Each stage answers a buyer question and leaves behind a decision you can inspect. The next stage only opens when the expensive uncertainty in the current one is small enough to accept.
- 01Understand
Trace the real workflow
Where is the cost or failure actually coming from?
Follow one piece from start to finish: intake and measurements, design and approval, pricing and materials, the bench queue, and the ready message and pickup. Include the workarounds, the phone calls, the duplicate records, and the corrections that a tidy process diagram usually misses.
Decision produced
A map of the workflow, exceptions, owners, systems, and the baseline cost or delay worth changing.Risk closed
Paying to automate the visible symptom while the expensive constraint remains. - 02Shape
Choose the first useful release
What needs to exist together for one useful result to work?
Choose the shape from the way the work happens, not from a preferred technology. Name the kinds of work you take in, how pricing works, the queue rules, who can access what, the exceptions, and the result the first release must complete.
Decision produced
The right mix of web, mobile, desktop, browser extension, connected device, or behind-the-scenes connection work, with the first-release boundary and a clear definition of done.Risk closed
A small-looking feature list that quietly depends on several interfaces, systems, and owners. - 03Prove
Review working software
Will it hold up outside a controlled demo?
Review the product against the agreed workflow, not a tour of finished screens. Run a full framing job at a busy day's pace, change a design after approval and watch the price and queue update, and test what happens when a moulding delivery is late or a finished frame is never collected.
Decision produced
Working checkpoints tested with realistic data, real user types, system connections, recovery plans, and the people who will use or run the system.Risk closed
Discovering the important gaps during migration or after customers depend on the release. - 04Transfer
Release, measure, and hand over
Did the new workflow improve the original constraint, and can another capable team operate it?
Move a controlled set of users or records first. Compare time from intake to approval, jobs blocked on materials, frames sitting ready uncollected, or another agreed measure with the starting point before adding the next workflow.
Decision produced
A controlled release, comparison with the baseline, operating notes, account ownership map, and a recommendation for what should happen next.Risk closed
Measuring development activity instead of the business result, or depending on the original vendor to keep the system running.
What stays out of the black box
These are operating conditions to put in the engagement, not claims to take on faith.
The scope names one complete workflow
The user, the trigger, the decisions, the data, the exceptions, and what 'done' looks like. A screen list is not enough.
Progress is visible in working software
Reviews against the product at agreed checkpoints, while there is still time to act.
A scope change has a price before it has code
A new workflow or system connection shows its effect on cost and timing before anyone approves it.
Ownership exists throughout, not only at handover
Code, cloud, data, and provider access stay visible and under your control from day one.
The work is checkable without being technical
Checkpoints are working software you use yourself, reported in plain language.
Custom software by industry.
Start from your domain. Each area below is a working practice with shipped products behind it.
What it costs
Every project starts at $10K.
The first phase turns the costliest patched workflow into a scoped build with what 'done' looks like agreed in writing.
Starting investment
Starts at $10K
Workflow complexity, systems to connect, data migration, and user roles set the scope. After a 30-minute call, you get a written build, buy, repair, or wait recommendation plus first-phase direction. Free, whether or not you build with us.
Not ready to talk? Start here.
Four useful next paths: decide whether to own the software, estimate the cost range, understand what moves the price, or inspect a comparable recovery.
Run the build-vs-buy calculator
Compare the cost and operating trade-offs before turning a workflow into a development brief.
Estimate the cost range
Get a working cost range for your scope before you talk to any vendor.
Read the cost guide
See the scope factors that move price, timing, team shape, and long-term maintenance.
Inspect a product recovery
See what changed when UrShipper moved from four failed vendor attempts to a controlled migration.
Build or buy
| Buy an existing product | Build custom software | |
|---|---|---|
| Best fit | Handles your workorders, mockup, supplier lists, and bench queue with reasonable setup, and its pricing makes sense | The way your shop designs and prices its frames is itself the advantage |
| Manual work | Configuration and process changes can remove the constraint | Repeated manual work at the counter after every job has a measurable cost |
| Connections | Existing connections work with reasonable setup | A critical connection to your till, supplier ordering, or messaging service cannot be done cleanly any other way |
| Framing model | The product already handles your design approval, pricing rules, and queue the way your shop does | Own custom software only when your design rules, pricing, or bench queue justify build and support |
Work with us
Bring one stuck workflow. Leave with a decision.
In a 30-minute call, we will help you decide whether to buy, connect, repair, build, or wait. If custom software is not the sensible next move, that is still a useful answer.
- One named workflow owner and one complete path for the first phase.
- Scope, price, what 'done' looks like, and exclusions agreed before paid work starts.
- Code, cloud, data, and provider access remain under your control.
Frequently asked questions
Straight answers to what buyers ask before they scope. Still stuck? .
It is software that runs a framing job from intake to pickup. Each piece is recorded once with its owner, its dimensions, and what it came in for. That record becomes the design choices, the mat, moulding, and glass picked with the customer, the price, the bench job in the production queue, and the ready message at the end. Because every step reads from the same workorder, a measurement or a material change is entered once instead of being copied between a paper slip, a price list, and a phone call.
A gallery sells art: it tracks artists, consignments, exhibitions, and buyers. A framing shop makes something to order: it takes in a customer's own piece, designs a frame around it, prices the materials, cuts and joins them, and hands the finished piece back. The software on this page is for the second kind of business. Its centre is the workorder and the bench, not the gallery wall and the consignment record.
Everything the bench needs to make the piece without walking back to the counter. The workorder holds the outside and inside dimensions, the mat choice and how much of it shows, the moulding, the glass type, any mounting or special handling, the due date, and the price the customer agreed to. If the customer changes the glass after approving the design, the change lands on the same workorder, so the bench cuts to the current version, not the first one.
At the design counter, the customer sees the piece as it will look finished: the artwork with the chosen mat around it, the moulding at its real width, and the glass effect shown plainly. They approve that picture, or change the mat colour or the moulding while they can still see the difference. The approved mockup stays on the workorder, so if a customer later says the frame is not what they pictured, the conversation starts from the picture they approved, not from memory.
Moulding, mat board, and glass come from suppliers whose price lists change. The software holds those lists as the source for quotes, so when a list is updated, new quotes use the new prices instead of a laminated sheet from last year. A quote names the materials it was priced from, so a job priced before a change and cut after it can be explained to the customer from the record, not argued from memory.
Every approved workorder joins one queue the whole shop can see. A job shows what stage it is at, such as waiting on moulding, mat cut, joined, glazed, or ready, and what is blocking it, such as a length of moulding still on order. The bench works the queue in the order the shop sets, and the counter can answer a customer asking where their piece is without walking to the back and interrupting the person cutting it.
When a workorder is approved, its materials are known: which moulding and how much of it, which mat board, which glass. The software collects those needs across the queue, so ordering is done against real jobs instead of from memory at the end of the week. A job waiting on a delivery shows that on the queue, and its due date can be discussed with the customer before it becomes a missed promise.
A finished frame moves to a ready list the moment its workorder is marked done, with the day it became ready shown on it. The pickup message goes out from that status, and any frame still sitting there after the shop's own set number of days stands out on the list instead of blending into the wrapped stack in the back. The shop sets its own rule for how long it will store a finished piece and what happens after that; the software holds the ready date and the messages sent, so the conversation starts from a record, not a guess.
Yes, when those parts are named in the scope. A design consultation, a bench job, and a ready-made frame sold from the wall are different kinds of work, but they share the same materials, staff, and customers. Scoping names which of them the first release covers and which stay on the current till for now. Starting with the custom workorder run, from intake to pickup, is usually the path that pays first, because that is where measurements, materials, and promises are lost.
Buy an existing product when it handles your workorders, your mockup, your supplier lists, and your bench queue the way your shop runs them, and its pricing makes sense. Build custom when your design and pricing rules are the way your shop competes and no maintained product will hold them, when repeated counter work after every job has a measurable cost, or when a critical connection, such as your till or your supplier ordering, cannot be done cleanly any other way. If your pricing and queue rules are still changing every month, wait and settle them first.
For a small, well-defined task with someone technical managing it, freelancers are often cheaper. The pattern that goes wrong is a non-technical buyer coordinating several freelancers becoming the project manager, the tester, and the person who discovers the pieces do not fit. An agency earns its fee when the work needs coordination across screens, rules, data, and connections: one accountable party, one phase price, and checkpoints against the whole workflow. If your need is one screen or one fix, hire the freelancer.
First phases start at $10K. A complete quote names every kind of user, including your own team: customers approving a design, counter staff taking intake and payment, framers working the bench queue, and the owner or manager running the day. It also names the system connections, such as your till and payment service and your supplier ordering, the customer, piece, and past job records to be moved over, and what is excluded. The first paid phase may cover a bounded audit, a proof of concept, a recovery plan, or a small first release. The final price depends on how many kinds of work you take in, how your pricing and queue rules work, how supplier lists are maintained, what it needs to connect to, whether past job history needs moving over, and the condition of any existing system. The agreed phase is priced in writing before it starts, and any change is priced and approved in writing before the work is done.
Timing depends on scope: a bounded audit or proof of concept is a smaller engagement, while a system covering intake, design, pricing, the bench queue, and pickup takes longer. The schedule is set once the first workflow and what 'done' looks like are clear. The calendar holds more than building. It also holds settling your workorder rules, such as who can change a price and how long a finished frame is stored, loading your supplier lists, moving past job records over, till and payment provider access and approvals, and training for counter and bench staff. Dates slip when records arrive late, approvals wait, or pricing rules change mid-build. A first release that lands in the holiday framing rush gets its first real test in your busiest weeks, so starting early enough for quieter weeks to settle it first is part of the plan.
Yes. Takeover is a common first engagement, and it always starts with an audit: where the code lives, how your data is organized, what is tested, which outside services it depends on, who can access what, and how updates go live. Code that is understandable and fit for the next release stays; only the parts blocking reliability get replaced. And if you already paid another vendor and have nothing working, the audit tells you which story you have before you spend more: the most expensive version is the product that looks finished, clean screens and clicking buttons, while underneath nothing is tested and the important checks run in the browser, where anyone can tamper with them, instead of on the server where they hold.
Security starts with the data, the people, who can see and change what, the systems it connects to, and where it runs. A framing shop system holds customer contact details, payment records, and records of pieces in the shop's care, so the scope can include access controls, separate testing and live environments, protected passwords and keys, activity logs, backups, and recovery plans. We write down which protections are included and which evidence your team must provide. While we work: penetration testing is taken care of. No production data is used in development, ever: testing runs on made-up customer, piece, and workorder records. Backups are tested, and there are offboarding steps when someone leaves a team. The third-party services this design sends data to, such as payment services, cloud hosts, and any messaging services, are named in the scope document before you sign. We claim practices we can show you, not certifications.
Those duties stay yours. Rules on caring for and insuring customer property in your shop, sales tax on framing work, and local business record rules apply to your shop and your work, and the obligation sits with the business that takes the piece in. What the software can do is hold the records those duties need, such as which piece belongs to which customer, what condition it arrived in, and which workorder it sits on, and produce them in the form your shop already uses. Scoping names which records the system holds for those checks. We will explain plainly what the system records and what it does not, and we never describe a system as making your shop compliant.
We need one person who owns the workflow, access to the relevant users and systems, timely answers on business rules, and someone who can accept or reject each milestone. A weekly working session is usually enough once the scope is stable. Your team should not have to manage developers day to day.
Ask for the quote to name everyone who will use the system, including your own team. Every platform has two products: what customers see, and what your people use all day: the design counter screens, the bench queue, materials ordering, pickup lists, refunds, and a record of who did what. When that second product is quoted as an 'admin panel' on a single line, it becomes the overrun. Our quotes treat your team's screens as their own scope, with their own users. Then the phase names the workflow, what 'done' looks like, the price, and the exclusions, all before paid work starts.
You judge what you can see, not the code. Every checkpoint is working software you click through yourself, tested against the workflow agreed at the start: take in a piece and watch it become a workorder, approve a mockup and watch the price and the queue change, finish a job and watch the pickup message go out. Progress is reported in plain language: what changed, what's next, and what it costs. Because you own the code, the accounts, and the operating notes throughout, nothing about the work is locked inside our heads. Our job is to make the work checkable; your job is to check it against your business.
You own it, from day one. The code built for you, the cloud accounts, your customer, piece, and job data, analytics, and third-party subscriptions are in your name from the start, not handed over at the end. Outside services and open-source pieces keep their own licence terms. The operating notes and handover material stay current throughout, so another capable team can take over.
After the first release, work can continue as another fixed phase, as an ongoing product engagement, or with your own team running the system from the operating notes. Support arrangements are agreed in writing rather than assumed. Whoever maintains it, the standing costs keep running: hosting, payment service fees, messaging service charges, and any connected-service subscriptions the shop uses. The code and accounts stay under your control either way.
You already hold everything. The code, the accounts in your name, your customer, piece, and job data, and the operating notes stay with you from day one, so there is nothing to extract from us and no unlock step. Another team can pick up from the notes as they stand.
We work on five principles. Switch to Async: updates are written so you can read them between customers, not in a meeting you have to attend. Be Prepared: calls cover decisions that are ready to be made. Write: decisions and changes are written down where both sides can find them. Ask and tell: questions and bad news are raised in writing as soon as they appear. Own: the person working on a piece owns its outcome and says so plainly.
Yes. We sign your NDA before anything sensitive is shared, and the details you share for scoping, such as your labour rates, materials margins, and customer numbers, stay confidential. The stronger protection is ownership: the code, accounts, and data are yours from day one.
No. The team that scopes your framing shop system builds it, and the people on your calls are the people on your project. Our teams are in India & Ireland. Payment and messaging services named in the scope are systems the software connects to, not a handoff of your project.
RaftLabs builds with its own AI workflow process called RaftKit, which you can read about at raftkit.com. In plain terms, the work moves through five stages: a blueprint of what is being built and why, a written plan, the build itself, a two-stage review where work is checked before it can move on, and a final stage where what was learned is written down for the next piece of work. Problems found in review are graded, and the most serious grade stops the work from going out until it is fixed. For you that means the framing workflows are planned in writing, checked in stages, and tested against the way your shop actually runs, rather than code appearing in one pass that nobody has reviewed.
![Custom framing shop software for [shops where the price lives in the details of each piece.]](/_next/image?url=https%3A%2F%2Fassets.raftlabs.com%2Fservice-assets%2Fcustom-framing-shop-management%2Ffeatured.png&w=3840&q=75)